Wetland Park Impression (courtesy DASUDA)

CDR and DASUDA have carried out the following:

  • Hydraulic modelling of streams crossing the project area by means of SWAT modelling software
  • Hydraulic modelling of Lagos Lagoon – tides, extreme water levels, etc. (Delft3D – Dflow model)
  • Ecological assessment – suitability of different vegetation types
  • Conceptual wetland design as well as Detailed wetland design