CDR Engineering ConsultantsCDR Engineering Consultants
  • Home
  • About us
    • About Us
    • Meet Our Team
    • Download Profiles
  • Disciplines
    • Coastal Protection & ICZM
    • MetOcean Studies and Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Inland Waterway Transport
    • Flood Protection and IWRM
    • Dredging & Land Reclamation
    • Port Master Planning and Engineering
    • Geospatial, Surveying & Environmental Studies
    • Infrastructural Engineering
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact
  • Home
  • About us
    • About Us
    • Meet Our Team
    • Download Profiles
  • Disciplines
    • Coastal Protection & ICZM
    • MetOcean Studies and Hydrodynamic Numerical Modelling
    • Breakwaters, Revetments and Marine Structures
    • Inland Waterway Transport
    • Flood Protection and IWRM
    • Dredging & Land Reclamation
    • Port Master Planning and Engineering
    • Geospatial, Surveying & Environmental Studies
    • Infrastructural Engineering
    • Geosynthetics Engineering
  • Projects
  • News
  • Contact

Dubai UAE – Overseas AST – Bluewaters Island Design Breakwater

Offshore the Dubai Marina, the Bluewaters Island development is currently under construction which further enhances the Dubai waterfront. Overseas AST is installing a district cooling pipeline from the mainland to the island over the existing main breakwater of the Dubai Marina entrance. The approximate pipeline location has a length of approx. 300m.
CDR provided Technical/Engineering assistance for:
– Technical solution for the installation and protection of the pipeline (two alternatives);
– Principle design drawings of the recommended technical solution;
– Redesign of the breakwater whereby the pipeline is located inside the breakwater.

CDR Eng. Consult. (Nig) Ltd.

Registered Office:
15A Olarenwaju Ninolowo Street
Lekki Phase 1
Lagos, Nigeria

© 2021 CDR Engineering Consultancy (Nigeria) Ltd.