Wetland Park Impression (courtesy DASUDA)
CDR and DASUDA have carried out the following:
- Hydraulic modelling of streams crossing the project area by means of SWAT modelling software
- Hydraulic modelling of Lagos Lagoon – tides, extreme water levels, etc. (Delft3D – Dflow model)
- Ecological assessment – suitability of different vegetation types
- Conceptual wetland design as well as Detailed wetland design