Description of services:
CDR was requested to carry out:
1.Determination of basis of design
2.Hydraulic studies
3.Layout design and optimisation
4.Ship simulation study
5.Design of revetment
Dangote oil refining company intends to increase berthing capacity at Dangote Quays. Therefore, the design of a new port arrangement is required to satisfy this quest