The owner requirements as written for the project on 07 December 2015 form the basis of this CDR design study, focusing on the dredging works. This study contains the following scope items (1) Assess local Hydraulic conditions for design and sedimentation analysis (2) Design of dredging works for different zones: anchorage and manoeuvring areas, access channel and berth pocket for Kamsar maximum type vessels (3) Assess local morphology and sedimentation of the dredged works.
CDR, and its partners, have carried out and delivered the study containing (1) Hydraulic Conditions (2) Optimisation Dredging Design (3) Sedimentation Patterns and Rates.