CDR has carried out task 5 of the Feasibility Study, which included:
- Analysis past and present situation Odaw river and Korle lagoon i.r.t. interceptor weir
- Function and design of interceptor weir
- Assessment present situation interceptor weir
- Hydraulic assessment, sedimentation assessment
- Future options interceptor weir
- Waste removal and business case for re-use of plastic
- Conclusions and recommendations for interceptor weir
- Recommendations for performance-based dredging criteria
Site Visit Accra